Complete the first row.
How to install galvanized steel roof panels.
Begin on the left side of the roof working to the right.
Lay the roofing felt.
Once the first sheet is in place you need to install the remainder of the lowest row of corrugated metal roofing.
The sheets should overlap by at least four inches add a bead of caulk where they overlap and at the other end of the building ensure there s an overhang of two inches.
Buy the metal panels.
Snap a vertical chalk line 1 4 inch from the rake edge of the roof using a chalk box.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
This will keep the wall straight as you place additional panels.
Install the first metal panel on the low end of the roof square to the eave.
How to install galvanized roof panels preparing for metal roof installation.
By installing the first panel square the rest will follow suit.
Wear hearing and eye protection.
Installing the galvanized roof panels.
If yours do not.
Install the panels with the ridges horizontally or vertically inclined as you prefer or cut the panels into squares and.
Finish the first side of the roof.
Secure the sheets into place with screws.
Start at the end of one wall and use square up.
Lay and secure the first metal panel.
Paint or prime cut edges to prevent rust.
Corrugated galvanized steel panels make striking wall or ceiling covers.
Place the first screw.
Install the first galvanized roof panel at one bottom corner.
Prepare the roof with strip sheathing 1 by 4 inch boards nailed horizontally.
Space the screws about 12 in 30 cm apart.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Use your neoprene washer head screws to secure the metal to the sheathing.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Install the roofing screws vertically along each rib in the panel.
Step 1 cut the panels to the desired length.
Metal panels are made to overlap a few inches in the grooves.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
Some panels have pre drilled holes.
For exposed fasteners avoid over tightening the fastener.
Most panels come up to 32 feet 9 8 m in length.
Ensure that the line is square with the eave.
Angle grinder 1 x research source the fastest option.