Screw a downspout elbow to the outlet tube protruding down from the gutter.
How to install gutters using chalk line.
Measure the end point of the gutter with downward slope.
Firmly hit the top of the nails with a hammer to drive them into each point.
Using a ladder snap a chalk line between the corners where you marked the old gutter locations.
Using the chalk line to keep the gutters flush with the slope line attach the downspout outlet to the fascia with the power drill.
When the old gutters are removed you need to mark the slope for the new gutters.
Slide the splices on as far as they ll go.
Drag the string to the end point and hook it over the nail.
Below the shingles on the high side of the gutter run.
Determine the length of the gutter by measuring the fascia.
Hidden fasteners are placed every 24 inches along the gutter run.
Get the chalk line to determine and mark the highest point of the gutter run.
Begin by installing a slip joint splice on each end of an inside corner fitting.
Secure the downspout outlet to the gutter with four pop rivets or screws.
Install gutters 1 1 1 2 the end point so that they can drain water from overhanging shingles.
Cut the hole for the downspout using a hole saw.
Hook one side of the chalk line to the nail at the start of the gutter run.
When installing gutters set the proper slope by driving a nail 1 2 in.
Press the cap onto one end of the gutter.
Apply gutter sealant to the end cap.
Place a chalk line across the fascia to create an appropriate angle toward the downspout end.
You will need to mark and cut the holes to install the downspout.
You only need a slight slope to drain water.
Slip h idden fasteners into the gutter run and screw the gutter into the fascia with a drill and screws.
There should be an outlet at the bottom of the gutter to where the hole should be marked.
Repeat this process around the perimeter of the roof until all the gutter locations are adequately marked.
Hold another elbow against the house and cut a piece of downspout to fit between the two elbows.
Installing gutters in 18 steps snap a chalk line across the fascia creating the proper pitch toward the downspout end.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
Locate the endpoints and hold a nail over each.
Snap a chalk line between the start and end of the gutter run.
Measure the fascia to determine the length of the gutter.
Measure and record the distance from the bottom of the fascia board to this nail.
Apply gutter sealant to an end cap then press the cap onto one end of the gutter.
Use needlenosed pliers to slightly crimp the elbow to fit into the downspout as shown.
Use a chalk line and make a mark from the inside of drain outlet.
Then trim the first section of the gutter to length with tin snips.