Nebraska state capitol building rise into view.
How to install hardie board and batten siding.
After a morning.
Join factory edges and place the cut edges against the corner trim boards.
Homesteaders and farmers would use sawmills to cut the long boards and the battens were put in place to make the structure as airtight as possible.
Priming or staining prior to installing your hardie board and batten is a must since this process keeps their quality from being compromised.
Cut a piece of 6 inch wide steel coil trim about 1 inch longer than the width of a siding board and place it behind the joint.
Traditionally board and batten siding starts with wide vertical planks boards which are then joined together by thin vertical strips battens to cover the seams.
In addition to applying stain to both sides and all edges nailing both boards and battens correctly also is key.
Since the primer or stain acts as a preservative it gives your board and batten added toughness that will keep them from deteriorating quickly.
Here there are you can see one of our how to install hardie board and batten siding gallery there are many picture that you can surf we think you must click them too.
If your sheathing is not solid you will need to first attach horizontal furring strips.
Board and batten can be installed onto solid plywood or osb sheathing.
Rdesigns suggests the traditional method.
Hardie board installation will require joints between planks.
Be sure to go to the 14th flooring statement deck for a nice view of lincoln and the surrounding countryside.
Prime or stain all surfaces of the board and batten.
Caulking joints are unnecessary but flashing behind the joints is required.