Protect edges and corners from breakage.
How to install hardiplank shake siding.
Measure down from the top of the installed board 1 1 4 inches every four feet and make a mark.
Be sure the flashing overlaps the siding course below.
Leave a small gap at butt joints and fill.
Install a 16 inch panel on the.
Install flashing at all end joints where two pieces of siding butt together.
Hardieshingle siding single family installation requirements hs1067 p1 8 04 18 store flat and keep dry and covered prior to installation.
Hey even seasoned pros need to occasionally check up on an installation best practice.
To help you get your project done right the first time we ll be gathering tips answers to commonly asked questions and more about james hardie siding installation.
Nail the board to the house every 16 to 24 inches with a roofing nail along the nail line printed on the top of the siding board.
James hardie is not responsible for damage caused by improper.
Installing siding wet or saturated may result in shrinkage at butt joints.
Install a 32 inch panel on the second row using the cut end to abut the trim.
When installing fiber cement siding always leave a gap at the ends of each length of siding.
Step 2 apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.
Carry planks on edge.
While shake and shingle siding are most often associated with cape cod style homes they can add instant character to any style home anywhere.
Measure and cut 32 inches off the first piece of the third row saving the cut pieces to use on the other end of the.
Apply caulk to the joint before and after installing the siding.
Measure and cut 16 inches off the first piece of the second row.