Using your staple gun secure the felt to the roof.
How to install starter roofing.
Gaf pro series starter strip shingles valley hip install.
Then move into the attic and apply to the underside of the opening and vent.
The end should overhang over the edge about 1 4 to 3 4 of an inch.
Whether installed at the eave or the rake the starter shingles should overhang the edge of the roof by inch to inch.
Quick installation tips for how to install gaf starter strip shingles on a roof.
Finally nail the first course of shingles directly on top of and flush with the starter course.
Using four roofing nails or up to six in high wind areas secure the starter shingle to the surface of the roof.
Do not penetrate the shingles with the hammer.
You will want the roof granular side up when applying the strip.
Install new flashing metal.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Continuing with the starter shingles.
First snap a line for the top of the.
Butt the edges together instead of overlapping them.
How to do it prep work space.
Detailed installation of starter strip shingles at the valleys and hips.
If possible have the shingles delivered via a boom directly onto the roof.
Where do the nails go.
Before peeling the shingle starter strip trim about 4 inches off an end of the first starter strip and align the strip to the area you are planning to stick it on.
After the first shingle has been placed on the roof set the second starter shingle next to it.
Typically the finish shingles are then installed to align with the edge of the starters.
Install a starter strip.
Overlap each row at least 3 to 4 inches.
The adhesive on the starter course seals the tabs of the first full course.
Use four roofing nails per shingle as indicated on package instructions six nails in high wind areas.
Start by laying asphalt felt or other underlayment over the roof.
Drill starter holes if needed then scew down the vent with the fasteners in the installation kit.