So reattach the front leg to the side of the rv and raise it up a bit.
How to install tension rod awning.
Now that you are going to re tension the spring it s time to insert it back after you have reinstalled the torsion assembly.
Firmly plant the vice grips on the right awning leg s bracket.
Place one end of the tension rod against one end of the wall.
Secure the canopy using one 6 x 3 8 hex head screw on both sides.
The cotter pins are the ones that lock the spring tension securely while taking down the rv awning.
Hold the cushion against the tile or drywall with your nondominant hand.
Using an awning stake.
Install bottom brackets place top pivot in position over awning rail from below snap the patio foot on the bottom of the inner arm into the as shown in fig.
Installing a spring curtain tension rod is simple and easy to do.
Slide the awning fabric or roller cover out of the awning rail.
Now flip the lever to the rolled up position and carefully unroll the awning.
Insure the arm top centered with the main support arm.
Install an rv awning video demonstration step 1 place butyl tape cam25013 along the back of your extrusion rail.
A 1 8 cotter pin can be inserted in each torsion assembly for positive locking of the roller tube.
Keep a firm grip on the vice grips and lift them slightly to release pressure from the awning control lever.
Place one end against the wall in your bathroom where you want to install it.
Rotate this leg clockwise as many times as you did the front leg.
Your awning can be secured by using an awning stake and tie down straps.
You should now be at the rear of the awning facing the front.
The butyl tape will help keep out moisture and prevent leaks.
Secure awning to awning rail 7.
Step 2 with a helper hold the extrusion rail against the rv in the location of your choice.
Lower the rear leg detach it from the rv and prop it up on the ladder like we did for the front leg in the previous steps.
Release the spring tension of the awning.
When you release the tension in the spring the cotter pin that is inserted in the holes in the awning arms are removed.
While standing in front of the awning pull the awning tube downward and toward yourself.
Repeat this step with the other tensioning arm.
2 1 for vinyl awnings place screw through awning rail polyrod and canopy approximately 1 in from the end of the fabric.
With your free hand tighten the knob on the upper tensioning arm.
With this type of curtain rod there is no drilling no tools and no screws required.
It doesn t matter which end of the rod you start with.
To keep the awnings from unwinding during this step be sure the cam lock lever is in the roll down position.