Install the termination bar with an acceptable hammer plug system at 200 mm o c.
How to install termination bar with epdm roofing.
Prior to installation of the termination bar pull back the topside of the membrane flashing 20 mm and apply a bead of water block between the membrane and the wall.
Fold back the rubber membrane over the surface to be joined to.
The bar is 25mm x 3m and has pre punched holes every 150mm on center.
This is how to install epdm roofing correctly.
How to install a termination bar video and installation guide fold back epdm and apply water cut off mastic.
Start with the edge facing the wall and work towards the roof s edge.
Metal edge termination epdm detail.
If using water based adhesive the technique involves spreading adhesive onto the roof using a paint roller in sections of three or four feet across the leading edge.
The termination bar is an extruded aluminum bar that s designed for securing and sealing compression type flashing terminations when the water cut off mastic is inserted behind the epdm membrane and lap sealant is applied along the top of the termination bar.
Full installation of classicbond epdm roof with sure edge trims.
Do not remove the protective paper.
For more information please visit http.
Position termination bar on.
Apply termination tape to the wall just below the line.
With a pencil or chalk line mark the desired rubber perimeter on the wall and roof edges.
Pull the rubber from the shipping box and drag it across the roof.
Installing z bar flashing on tpo termination bar.
Do not bend the bar around the corners.
Apply termination tape to connect the wall and roof tapes so the entire rubber perimeter is sealed.