Some roofers install shingles so the cutout lines describe a slight angle as you look from the bottom to the top of the roof.
How to lay 3 tab roofing.
Make sure that the tabs are lining up with the bottom line and that the tabs are facing down.
Staple this felt down starting at the lowest point of your roof and working upward.
Install the drip edge over the gable end felt and under the eaves felt.
Video 8 install lp smart side panels part 1.
Roll out and staple down roofing felt in overlapping rows.
Video 14 how to install an entrance door.
Again use four nails to install the three tab shingles.
Each tab is 12 inches.
Video 9 build install soffit ladders.
You will once again need 4 nails whenever you are installing the 3 tab shingles.
However make sure that you do not nail into the tar strip.
However most people prefer the cutout lines to be aligned so they make straight vertical lines.
Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.
The first full shingle that you lay will need to be laid along the centerline of your roof.
Next lay your first full single row of shingles by aligning the shingles on the centerline of the roof.
Overlap each row at least 3 to 4 inches.
Video 13 installing 3 tab roofing shingles.
Video 10 install roof sheathing.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Many pros shingle in a vertical line up the roof because it s much faster.
Some roofers will use 15 pound 6 8 kg roofing paper which is an effective method although the best method is a self sealing membrane with a rain screen.
Video 12 install lp smart side panels part 2.
How to shingle a shed with 3 tab and architectural shingles.
Overlap each row at least 3 inches.
Three tab shingles are usually 36 inches long.
The tabs should be facing down and aligned with the bottom of the starter line of shingles.
Lay a starting row at the bottom of the roof along the edge.
Start by laying asphalt felt or other underlayment over the roof.
They are designed to be installed with a 5 inch reveal.
They will go in the same location as the nails that went in on the first line.
Video 11 install fascia boards soffit material.
Using your staple gun secure the felt to the roof.