Measure one panel width in from the roof edge.
How to lay apro panel roofing.
Take measurements from the roof peak to the eave for custom cut premium pro snap panels.
Always begin working at the point with the longest peak to eave distance.
If yours do not then you will need to drill holes.
8 inside closure install along the length of the transition trim about 2 above the bend.
A typical 2000 square foot project costs 22 382.
6 transition trim place trim over outside closure.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Panel roof cost non discounted retail pricing for.
50 yr limited warranty.
Take care the first piece is aligned precisely perpendicular square to the edge.
The roof panels will not withstand the weight of a person standing at the edge of the panel.
Fasten using panel wood screws.
10 panel wood screw space according to the recommended fastening pattern and local codes.
The total price for labor and materials per square foot is 11 19 coming in between 9 59 to 12 79.
The national average cost to install panel roofing is 6 13 per square foot with a range between 5 05 to 7 21.
Use a scaffold for easy access to the roof.
Contact building regulators to determine the requirements for.
9 roofing panel install with lower edge 1 above the transition bend.
How to install premium pro snap roofing step 1.
Installing corrugated roofing 1.
Some panels have pre drilled holes.
Do not stand on the roof panel until the panels have been attached.
Pre drill holes on the ridges.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Place the first screw.
Allow for a minimum of 18.
Place the leading edge of the first panel along this line.
Measure the roof with a.
Double embossed 26 gauge galvalume coated steel shingles.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
Pro panel ii install guide.
Cut the panels to the desired length.
At this point chalk a line from ridge to eave.
Quantity includes typical waste overage material for repair and local delivery.
Most panels come up to 32 feet 9 8 m in length.
Add the metal panels.
Install the roofing screws vertically along each rib in the panel.