Use a 4 foot carpenter s level to keep the boards vertical.
How to lay batten boards for barn roof.
The boards will typically try to cup as they dry.
If you pre drill the boards use one as a pattern and drill the rest of them on a flat horizontal surface.
Install 10 x 1 vertical siding boards from top of water board drip flashing to top of wall spaced 1 apart.
When putting up the boards pay careful attention to the growth rings.
On wide boards 12 or wider put 2 nails about 2 to 3 inches apart in the middle.
Install 10 x 1 water table skirt board at base of wall.
Bargeboards and in some cases gable end brickwork are prone to deviation in their length just like the fascia boards at the eaves and this can transfer itself to the verge detail when installing the undercloak.
Writing to fine homebuilding s breaktime forum wenws is looking for some advice on the best way to finish the board and batten siding for his new house.
While roof battens are most commonly made of metal or wood they can be made of other materials like plastic or composite there are several different types of batten some combine two materials to get the needed affect.
There are many ways to nail board and batten siding.
Install board and batten siding and trim.
Install 3 x 1 border trim at top of siding.
Battens should be nailed to the centre of the rafter and any joints should be directly over a rafter with the batten square cut tightly butted and skewed nailed.
Boards want to cup one way so put the hump out bark side in and put one nail in the center.
Here are four methods to do the job right.
Types of roof batten systems.
For example elevated battens are standard wood battens that have a block of plastic in some cases wood attached to the underside to elevate.
I also didn t need the door to be water tight since there s a roof over the area.
This is what people who nail green board and battens up say.
Install drip flashing on top edge of skirt board.
Barn doors were typically made with leftover wood from the barn build and like i said before built to withstand weather movement.
Roof undercloak installation overview.
The battens are vertical boards on the backside.
His plans call for 9 1 2 in.
Jam them up tight and put the batten on so that the nail hits between the two boards.
When set in mortar a cut batten end should be treated or the batten turned so that the treated end is in the mortar.