The paper should then be nailed in or stapled every three to four inches across.
How to nail down roofing felt.
Ensure that you hammer the nails properly into the roof don t leave the nails sticking up above the layer.
Step 1 prep the area.
Remove old felt from the roof with your hands and a putty knife.
Cut drip edge flashing at an angle at the corner press it lightly against the eave end.
Cleaning and preparing your roof 1.
How to do it.
Step 5 secure ends.
Apply and attach drip edge.
Make sure you use a strong hammer and 1 inch 2 5 cm roofing nails.
Step 2 roll it out.
Grab loose pieces of felt and pull them off the roof.
Nail the roofing in place with short roofing nails spaced 6 inches apart.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
Use 1 inch nails for new roofing.
Clean the roof decking of any debris protruding nails or other objects.
Place this roofing material so it straddles the valley.
Cut this piece of roofing to an 18 inch width with a utility knife.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof deck over the drip edge.
Gently scrub the roof using a bristle.
Hammer the nails in at 10 inches 25 cm intervals across the roof.
All nails and staples should be placed on the lower half of the paper.
Step 3 overhang paper.
An assumption is made all materials are ordered based on the necessary measured requirements.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Includes useful advice on the best materials to use together with information.
They are long enough to penetrate the sheathing.
Overlap and cut drip edges.
Step 4 over the peak.
Apply drip edge to the eave.
Use a trowel to spread roofing cement over half or more of the strips.
Step by step guide on how to apply bituminous roofing felt to your shed roof.
Dry the roof surface.
If you have a sloped roof cut strips of roofing 9 inches wide position them flush with the drip edges along the eave and rake and attach them by driving two rows of nails that are about 3 inches apart.
In roofing one square equals 100 square feet.
Roll out about 10 feet of.
An underlayment of felt roofing is optional.
Valley ridges and hips should have a 6 inch overlap of paper.