Hook your tape measure to an outside corner edge of your framing.
How to properly install t111 siding.
It has been in use for more than four decades wherein the core concept and the appearance of the t1 11 siding is still similar to its decades old format.
Following the two tips below will help in this regard.
Remove all excess wood nails and debris from your studs where you will be installing t 111 siding.
Siding manufacturers make t1 11 siding a five ply exterior grade plywood siding in 4 foot by 8 foot sections with a grooved surface and shiplap edges.
The t1 11 siding s 1 inch wide 1 4 inch deep grooves are spaced 11 inches apart.
The best option for windows is the type with a vinyl flange all the way around.
Begin siding by starting at the bottom of the building you want to side.
T1 11 s grooves and shiplap edges run parallel to its 8 foot long edge.
Place your t 111 siding on the saw horses for easy handling and cutting.
If you paint it giving it.
Start at the bottom and work your way up.
Prime all four edges of each sheet before you hang it as a safeguard against moisture damage.
John latorre a contractor in tolumne california replies.
T1 11 sidings are sold in two main variations.
How to install t 111 siding.
T 111 is best installed over tar paper or housewrap stapled to studs.
T1 11 siding first rose to prominence during the late 1960s.
While t1 11 siding is not as durable as most sidings it can be installed so the upkeep on the siding is lessened and you can keep it well maintained.
T1 11 siding grades varieties.
Paint or stain t1 11 after installing it to lengthen its lifetime and enhance its appearance.