Paint or prime cut edges to prevent rust.
How to replace a corrugated iron roof.
Step 3 patch.
Step 1 gain access.
Here i show you how easy it is to re roof a shed with onduline roofing.
Remove old roofing and repair any damage start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
Some panels have pre drilled holes.
If it is an extendable type make sure that extensions are secured.
Divide the square footage of your roof by 18 to give you the number of sheets you ll need.
Step 4 conduct regular inspections.
Inspect the underlying roof sheathing for damage and make any needed repairs.
A corrugated metal roof is incredibly cost effective durable and sturdy and has long been the preferred material for roofing for agricultural and industrial buildings.
Step 2 find leaks.
In comparison to an ordinary roof covered with asphalt shingles a corrugated metal roof can last up to three times as long as asphalt or 25 to 60 years.
Measure the length of the roof and the breadth of one side.
Multiply those numbers and then double the result for the square footage of your roof.
Corrugated metal roofing generally comes in sheets that are 3x6 feet in size 18 square feet.
If yours do not.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
Plant a ladder firmly to the ground.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
When i built my garden shed in 1987 i used onduline corrugated roofing following the.
Wearing a harness.
Angle grinder 1 x research source the fastest option.
Hammer down any large nails that are exposed by the removal.
How to repair a leaking corrugated roof.
Most panels come up to 32 feet 9 8 m in length.