Use a straightedge to help you transfer the angle you marked on the.
How to seal roof to wall on channel cedar siding.
The length of nail you use will depend on the thickness of the siding.
Pressure washing can damage cedar so if possible wash by hand.
Use a circular saw to cut the board to length and fasten it in place with nails.
Because most roof flashing is required to extend up the wall a minimum of 4 and some a minimum of 5.
Rough cut cedar siding is a durable building material.
Because it tends not to be as absorbent as a more traditional milled siding stains can have trouble penetrating.
Housewrap creates the foundation.
The non milled wood surface creates a rustic appearance but it can present some challenges when it comes to finishing.
Regular stains don t require primer.
The roof flashing is then placed up behind this through the wall z bar flashing on the outside of the vertical blocking backing material.
Galvanized hot dipped zinc coated and aluminum nails are all appropriate.
Most simply use a nominal 6 piece of lumber.
Measure the bottom piece of siding to the proper length which is the length of the wall to the roof line minus 2 inches.
Sheet of housewrap or even better a piece of self adhering roof underlayment to the wall before the first truss or roof rafter is placed against it.
Ideally i like to start by installing a 3 ft.
Wash part of a wall and allow it to dry thoroughly before applying the sealant.