In most other siding options the seams are a point of sealant.
How to stagger vinyl siding.
Eaves treatment measure from the soffit to the base of the upper lock on the previous course.
The siding laps should be staggered.
Lay out the panels required for the first course along the house.
Using a snap lock punch punch the vinyl siding along the cut edge every 6 152mm so the raised lug is on the outside.
All the panels are locked in.
If you don t cut your siding short when it expands in the summer it s going to buckle.
I have a line straight down the center showing where each of the panels overlap.
Position a nail at the top of the upper slot on both sides of the corner post leaving a gap of approximately 1 32 0 8mm between the nail heads and the corner posts.
I installed vinyl siding on one side of my house.
Some will stair step it others alternate the lap up the wall.
With time you will figure out what looks good and does not waste anymore material then needed.
As long as you are staggering them according to recommended specs it really does not matter what others are doing.
The nails are in but not to tight.
You need to leave at least 1 4.
If it doesn t work for that row save it.
Install the first panel by pushing the panel s buttlock up into the locking tab on the starter strip.
Cut the panels to length with tin snips.
The starter strip is level.
Siding boards usually come in uniform lengths so the best way to achieve a random stagger pattern is to cut the first board of each row a different length before installing it.
Everything is great except i did not stagger the panels.
Well done seams can also preserve the longevity of your siding.
How to stagger vinyl siding joints 1.
In vinyl and aluminum siding it s the point that allows for expansion and contraction.
You can often get great stagger patterns by using the off cut from a row you just finished to start the next one.
Everything else is fine.
Push the siding into the utility trim or.
Install the second panel so that it overlaps.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
Do you stagger the panels for aesthitic reasons or is there a.
A properly done seam will help keep harmful moisture out and increase the insulation of your home.