Install flashing before starting to apply the siding.
How to start installing vinyl siding.
This is our most comprehensive.
The corner posts should run from 3 4 inch 1 9 cm below the bottom of the starter strip to just beneath the eaves after the soffit pieces have been installed.
The siding slides behind vinyl siding trim pieces that hide the gap and the cut end.
Vinyl siding installation is designed to hang loosely on the sheathing so that it can expand and contract with temperature changes.
Gap at all ends.
To prevent the relatively thin panels from buckling observe these fitting and nailing rules.
Refer to important notes for more information on water resistive barriers.
Install 1 2 inch 12 7 mm foam sheathing strips on both sides of each corner then install your corner siding pieces to these strips.
We cover how to move doors and windows and create a weather proof exterior.
Begin by installing the first row of siding on both sides of the deck.
How to prepare walls for vinyl or aluminum siding.
A flat level wall surface is necessary for proper installation of vinyl siding.
Install starter strips trim.
Siding must be cut in lengths to provide for expansion.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
Vinyl siding must be nailed so expansion and contraction are not restricted.
You are not going to set it hard.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
Not just another vinyl siding installation video.
Install the corner posts.
How to install vinyl and aluminum siding and step 2.
When installing in freezing weather below 4 c.
Between nail head and vinyl.
Allow a 1 4 inch gap for expansion wherever siding butts accessories.
This will allow movement when it expands or contracts.
From the top of this row and stretch a string line across the deck.
Never nail the siding to your house hang it.
Choose the right nails allow approximately 1 16 in.
Now you re ready to begin installation of the starter strips and corner posts that receive the siding panels.
This is one of the most crucial steps in installing vinyl siding.
This article is a continuation of the discussion that began with step 1.