Lay one and two tab shingles as you near the valley so full size shingles will run across the valley.
How to tar a roof valley.
Insert the bar under a shingle and pry upward at a.
To secure the roof valley flashing nail it down carefully.
The reason why the roof valley is such a sensitive area has to do with all the rainwater and or melting snow that accumulates and flows through the valley on its way into the gutters.
Remove 8 inches of shingles at each side of the valley with a 16 inch nail bar.
Move to the highest end of the valley and work your way down cleaning shingles from both sides of the valley whether they re damaged or not.
Then i run a r.
Ensure ice and water protector has been installed along the valley first.
A roof valley is very prone to leaks especially if you have an older roof.
Only nail at the edges with only enough nails to.
Roof one side of the valley running the shingles across it.
I swear it is the fastest way out there.
Clear any debris in the roof valley and surrounding area.
Stop nailing 6 inches from the center.
Start at the top lay the felt paper from the top of the roof valley to the eaves at the roof edge.
Apply drip edge to the eave.
Use a chalkline or align it by eye to make sure it is straight then drive roofing nails every foot or so to fasten it to the sheathing.
Shingle the other side of the valley the same way.
Cut drip edge flashing at an angle at the corner press it lightly against the eave end not too hard or you will misshape it and drive a nail near the end.
Then starting at the base of the.
Take measurements of your roof flashing most flashing is 14 inches wide but yours may vary.
Use a broad strip of felt paper felt paper should extend at least 10 inches up each side of the roof valley so use a strip between 20 and 24 inches wide.
Take a close look at how i paper the 30 in the center of the valley.