Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
How to tie roll roofing into a shingle roof.
Push the rolled roofing down into the wet cement to secure it to the roof.
Even though the higher roof was installed first the end result.
As with applying shingles to any roof invert the bottom row of shingles for your starter row.
Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
Armourvalley or other materials like epdm pvc or tpo covering.
Mark this point of the.
In this video i show you how i do the valleys on a shingle roof.
For slopes less than 9 5 we cannot install roof shingles.
A flat roof isn t actually flat.
Roofing nails to the existing structural sheathing.
If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
This video shows the transition of a shingle roof to a metal roof.
Instead the roof must be done with a modified bituminous membrane e g.
At this point your will have a starter row at the bottom and a row of shingles along each side.
As you place the rolled roofing down stretch it to get rid of wrinkles and creasing.
Dbower for a roof that new tinner pretty much summed it up.
The first layer should cover the roof as far as the chalk line.
It has a slope of 2 3.
The flashing should double lap the roll roofing.
Many roofers cut the shingles across because they say it s safer.
No one of this affirmat.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
The most trusted miami roofing contractor professionally describes the installation of thi.
Place the first layer of rolled roofing on the roof.
String the line along the top of the frame until it meets the shingle roof.