This method of lead valley repair is proven to not only be fast and safe wit.
How to tile roof valley.
Valley with metal lining.
Cut tile and a half tiles and fix to form a straight weathertight close mitred junction.
Up next how to tile a roof with clay or concrete tiles new roof duration.
Never try and work on a roof from a ladder as a.
Installers develop a preference based on their experience with the local climate.
And either an organic or modified underlayment depending on whether tiles or shingles are being installed.
Autoplay when autoplay is enabled a suggested video will automatically play next.
The tile roof institute tri concrete and clay tile installation manual for moderate climate regions allows for open flashing exposed and closed tiles meet over flashing valley installations.
This video shows how to repoint a lead roof valley.
Download dwg file.
After you have determined the distance between the first two battens measure the distance and set battens using that.
Cover valley with a strip of underlay not less than 600mm wide underlapping general underlay.
Installing a close cut grp valley with redland 49 tiles.
A scaffold tower has been used for access in this video.
A roof using the open valley style involves placing a v or w shaped piece of metal usually galvanized or sometimes copper in the seam of the valley and then covered with a base sheet such as 30lb.
A minimum of a 3 inch overlap is required for the tiles.
Fix soakers by turning down over heads of mitred tiles.