To secure each angled shingle i drive one staple or shingle nail at least 2 inches above the lower edge of the next shingle course and into the top corner of the step flashing.
How to work on house siding above an angled roofing.
Measure the bottom piece of siding to the proper length which is the length of the wall to the roof line minus 2 inches.
Use a straightedge to help you transfer the angle you marked on the siding.
To set up once you have put the siding on as far as you can reach from the roof put the extension ladder with the ladder jack on the ground and run the walk board from the roof peak to the ladder jack making it level.
2 hang a plumb bob from the.
Measure the height of the piece you need to cut by butting a scrap piece of siding beneath and above the window and marking the necessary height leaving an additional 1 4 inch 0 6 cm of clearance.
Transfer this measurement onto the piece of siding.
Measure the height on the corner from house roof to dormer roof and cut boards to fit.
Mark the center of your 2 by 4 inch board using a tape measure and pencil.
Hold one edge of the level against the surface of your roof along the edge above the gable and adjust it until the bubble indicates that it is perfectly horizontal.
We typically rip a furring strip to about 3 8 inch and use it as a shingle ledger above the roofing material.
We made ours of half inch plywood with a lip around the top.
The center of an 8 foot long board is 48 inches.
To give the platform traction on the steep roof we attached two strips of self adhesive weatherstrip to the underside.
Put molding on the corners and around the window for wood siding either planks or shakes or shingles.
Use your pencil to trace a line up against your straight edge.
Another key to having the roof drain effectively while making this detail look professional is to create a consistent gap between the roofing and the cedar shingle siding.
End brackets hook and bolt onto the scaffolding frame to extend the work area.