Built up roof bur and liquid applied roof assemblies for use in class 1 and noncombustible roof deck construction fm 4474 2011 evaluating the simulated wind uplift resistance of roof assemblies using static.
Icc number for built up roofing.
Built up asphalt roofing 07 51 16 built up coal tar roofing 07 52 00.
The 2015 2012 2009 and 2006 ibc the roof underlayment must be installed in accordance with section 1507 2 8.
Methods of fastening for roof slopes of 2 12 16 7 to 21 12 175 and for roof slopes greater than 21 12 175 are as shown in figure 1 for the standard and high wind applications.
Flintlastic roofing membranes are components of roof covering systems that may be installed over new or existing roofs as described in tables 1a through 1d and 2a through 2f.
Number and location of fasteners and maximum exposure to the weather are described in table 1 and figure 1.
No filters are available.
In case of a conflict between the installation manual and this report this report governs.
This makes a spray foam roof system ideal for re roofing as it is possible to apply over an existing built up roof without removing it.
Csi division name.
5 2 the roof decking and roof framing system must be designed for the appropriate loads determined in.
Learn about built up roofing systems.
5 1 the roof tiles must be installed in accordance with this report the applicable code and the tri wsrca installation manual esr 2015p.
For slopes greater than 21 12.
Built up roofing systems.
Spray polyurea foam roofs have the highest r value spray foam roofs has an aged r value of 6 2 6 5 enabling it to provide more thermal resistance with less material than any other roof insulation.
The roof slope must be a minimum of 1 4 12 2 percent slope and must not be more than maximum slope for the particular system as specified in tables 1a through 1d.
07 52 00 modified bituminous sheet roofing report holder.
Icc es acceptance criteria for quality documentation ac10 dated january 2019.
Division 01 00 00 general requirements.
Icc es evaluation report esr 2018 reissued september 2015 this report is subject to renewal september 2016.
An icc es report is a document that presents the findings.
Get to know more about one of the most popular commercial roofing systems.
Under the 2012 2009 and 2006 irc the roof underlayment must be installed.
07 00 00 thermal and moisture protection section.
The panels are fastened through the existing roof covering to the roof sheathing in the same manner as.
Report number manufacturer product codes.