Install sheet metal drip cap over the lower rim.
How to install roof drip edge.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and.
Select enough lengths of.
Measure the length of the eave you need to cover with drip edge using a tape measure.
It can be done.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Be sure to tuck the drip edge under the starter strip and felt paper.
Learn more about drip edge at.
Build the lower rim of roof extended away from the fascia.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
If it doesn t pull the drip edge out slightly from under the shingles.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
The extension should be at least inch for it to work.
Insert the wide flank of drip cap underneath the first course of shingle or tile all the way through.
Once free slide the drip edge out and discard.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
How to install drip edge flashing on a roof step 1.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
You may need to nail through the starter strip into the drip edge.
Using drip edge with a nailing edge approx.
Secure the drip edge with roofing cement.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Make sure the outer edge extends over the gutter.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
How to install a drip edge.
Place a nail at one end then the other.
How to install drip edge flashing to a new roof.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.