Be sure to have adequate ventilation and extinguish all pilot lights before applying and drying the waterproofer.
How to put cedar siding on a house.
Your options include thicknesses from 2 to 4 and widths from 6 to 10.
It can also be butted against adjoining walls with a trim strip used to cover the joint.
How to install cedar bevel siding 1.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board.
Carefully slide the notched piece of siding into place.
The prime coat depends on the final coat.
Fasten a cedar starter strip.
Join the clapboards with scarf joints as in step 3.
Your options include thicknesses from 2 to 4 and widths from 6 to 10.
If more than one clapboard is needed to span a wall snap a chalk line between the marks on the corner boards on top of the course being overlapped.
Staple a layer of house wrap to the sheathing working from the bottom up and overlapping joints by several inches so that any water that reaches it will shed down the wall.
Nail the clapboard to the studs.
Horizontal hand hewn cedar log siding can be installed on an existing home or a new build.
With corner boards there is the choice of applying them next to the siding or over top of the siding as shown here.
Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or.
New cedar shingle siding is going over the old as part of a lead abatement program but the contractor is using techniques that make the homeowner nervous.
Wrap the house with a polyethylene or similar moisture barrier stapled to the wooden wall sheathing with a.
Learn how to properly install cedar shingle siding on an old house.
Attach vertical pieces to a long straight guide and attach to the wall as shown.
Again follow the manufacturer s recommendations.
As in the above illustration at inside corners siding is frequently butted against a 2 x 2 trim strip.
After the cedar has acclimatized and before it is installed it should be coated on all surfaces including the ends.
Always apply primer or stain end cuts.
Plywood sheathing provides a sound flat base for lap siding.
Place shingles on the guide board and fasten them offsetting joints by at least 1 1 2 inches.
Once you have built up the corners by about 10 courses snap a chalk line to mark the bottom of the next course.
Define the bottom.