You are indeed correct about the longevity of cedar siding.
How to put up cedar wave pattern siding.
Siding up to 6 inches wide can be blind nailed with one siding nail per bearing toe nailed through the base of each tongue.
Waterproof the window sills by covering them with flex wrap.
Extend the flex wrap at least 6 inches up the sides of each window opening.
Start at the bottom of the wall at one end.
The pro s way to install cedar siding.
Use the piece cut off from the first layer if possible.
This will enable you to coat both faces the sides and the top and bottom edges with no trouble.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall.
Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or semi permeable house wrap.
This is when each piece of cedar siding covers half of the one below it much like staggering and layering on cedar siding on top of one another to provide a scale like appearance.
Of siding and cause staining buckling and damage to finish coats.
Install drip edge flashing along the tops of the window and door openings.
For vertical installations nail to horizontal furring strips.
The traditional way to install cedar shakes is through a method called single coursing.
Thick narrow siding is more stable than thinner wider.
Start a second layer with a partial board so the siding seams do not align.
Installing cedar shakes is pretty much the same as installing shingles.
In horizontal application start at the bottom and work up with the groove edges facing downwards.
Use thicker siding patterns in widths of 8 in.
Align one of the vertical edges at the edge of the trim or.
Apply stain to cedar siding before hanging in order to achieve the most effective coating apply the oil stain to the siding before you hammer it up on your home s exterior.
The following recommendations are meant to minimize potential problems when wood sidings are applied over rigid foam sheathing.
For siding up to 6 inches wide use one nail one inch up from the overlap per bearing or stud.
Overlap the bottom of the second board 1 inch over the top of the.