Make sure the outer edge extends over the gutter.
How to replace drip edge on existing roof.
This is important to protect damage to your fascia soffits rafters.
Slide the flat bar under starter course and pry out the nails.
Replacing drip edge eave strips.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Use a flat pry bar to remove drip edge nails along the eave and rakes.
This lets any water that gets on the roof run down the underlayment and over the drip edge.
You may need to use a putty knife to break the seam between the first course and the starter strip.
If it doesn t pull the drip edge out slightly from under the shingles.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
With without rain gutters.
Place your nails in line with the marks on your drip edge and place it in the center of your fascia board.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Align one end of the lower eave strip even with the edge of the roof decking.
Secure the drip edge with roofing cement.
Use 1 2 nails through each rafter to secure your fascia board.
Drive 1 2 nails in per rafter so it doesn t move around.
Install the eave strips on the lower roof edges first with the eave strips under the shingles and felt underlayment.
If installing the roof from scratch i recommend a steel drip edge with a little overhang to help support the shingles but 1 2 is not enough in a climate with any of heavy rain wind snow or ice.
Lift up roof shingles and nail the eave strip in place with galvanized.
Now that the roof is applied it is much more difficult invasive time consuming to install the drip edge being 3 stories only makes it much worse.
When removing the roof they could have removed the existing siders edge and replaced it with the drip edge this would not have been very difficult standard even.
Installing drip edge on your roof.
At 7 05 paul begins replacing the drip edge roof flashing.
Tools supplies tin sn.